The Fun Part
October 16, 2026 · 7 min read
Two emails went out to clients in the last two weeks. One had a tracking link in it. One had a link to a proposal. Normal emails, the kind that go out all day.
A tool that reviews links sent to clients via email through HubSpot. It follows the links. It checks what it finds against our internal Slack channels and the knowledge base we set up this year. On the first email, it ran the tracking number and compared the carrier's delivery date to the date the client needed the product in hand. The box wasn't going to make it. The team rerouted the shipment before the client knew there was a problem.
On the second, the proposal had two products labeled wrong. It had been through our review process. The change was small enough that a person reading it for the fifth time wouldn't see it. The bot did. The team sent a corrected link and told the client about the error before the client found it.
The third catch came from a different place. Many colleges license their logos through a program with artwork requirements on every order. A new school came in, and nobody on the team knew it was licensed. The moment its project moved from presentation to estimate, our education team got a notification. They handled the requirements while they were already working on the art, instead of scrambling the week the product was supposed to ship.
Three catches, same shape. The gap between what we knew and what was true, closed before it cost anyone.
I didn't expect that to be the first win. Hours back on sourcing and art, the things I've been building toward since Demo Day in the spring, that was the plan. Instead, the first thing the team felt was eyes in places we don't have them, especially when we get busy.
The calls I expected
Last week I wrote that a team call didn't go great, and that the follow-ups filled my week with things to build for specific people. I assumed those follow-ups would be the normal kind of feedback. A little fix here, a label there. That's the nature of feedback on tools.
They weren't. They've been strategic calls. How could we use this? What if it watched for that? They felt more like change management than bug reports.
I think I know why. For most of this year I built general tools and asked the team to use them. Once the data layer was in place, I could build something different: a workflow for each team, shaped around how that team already works. Our beauty team lives on custom products as much as catalog products, so theirs is built around their vendors. The corporate team got their own. The education team's licensing process starts at the estimate stage, so that's where the notification lives. Same data underneath. A different shape on top for each team.
When a tool sits inside someone's real workflow, they give you feedback on how they really work. When it sits beside it, they give you feedback on the tool.
Two of the three catches I only heard about on check-ins that were already on the calendar. Just "how's it going." Nobody filed a ticket.
What I hadn't thought about
Tracking numbers and proposal review were not on my list. I had thought about sourcing. I had thought about art. I hadn't thought about the time it takes to chase tracking numbers across carriers and check each one against an in-hands date, or how many changes a proposal goes through before it leaves the building. The team brought both. "Maybe AI can help with this."
Both turn out to be easy problems once the data is standardized and you know where it lives. The context is a paragraph: here is what to do with a tracking number, here is how to review a proposal. What you get is a review process that runs at 2 a.m. The person still decides what to do about what it finds.
The dark room
Three weeks ago I wrote about the tension between the builder and the leader, and about the business pulling me out of the dark room. These two weeks the pull went the other way. I still like the dark room. I just have more to go with when I get back to it.
The tension didn't go away. It moved. It's less about the business pulling me away from building and more about protecting time for whatever is moving things forward. Meetings when there's something to meet about.
The buy-in did one more thing. It confirmed that a year of learning is working, and it made me want this to outlast me building it alone. Someday there may be someone on the team with real coding experience. So I started a course on Go and test-driven development, and I'm reading about functional programming. Not because I need a new language. Because if the team is going to depend on these tools, I want them built on practices that have held up in real software, not patterns I made up in isolation.
The fun part
There's a phase I didn't know about. A lot of tinkering, solving one problem at a time, and then a point where people across the organization start seeing it and bringing ideas. It stops being something I think about and push onto the team. It becomes a team thing.
That's the contribution layer inside a business. Everyone has a way in that fits the work they already do, and the thing gets better every time someone picks it up. The wins so far are small. They're also the first ones the team found on their own.
Jordan
P.S. What was the first win you expected from a tool, and what was the first one you actually got? Reply and tell me.
Get new posts delivered to your inbox.
Read more posts →